PU and Epoxy Floor Coating in Bangkok and Samut Prakan
BBCP assesses polyurethane (PU) and epoxy floor coatings for factories, warehouses, and other spaces based on the substrate and how the floor will be used.
Quoted by scope of work
Share photos or site details so BBCP can assess the work and confirm the scope in a quotation.
Before You Book
How to choose between PU and epoxy flooring
Start with the substrate, traffic, potential exposure to liquids, and the downtime you can allow. Performance varies by product and system, so the team should assess the site before specifying a coating.
What to send for a factory floor coating estimate
Share the approximate area, substrate, damage such as peeling or cracks, and intended traffic. Flag trolley or forklift use and slip-resistance requirements so the quote can specify preparation and the coating system.
Planning coating work around site traffic
Mark pedestrian routes, trolley or forklift traffic and available shutdown periods on a floor plan. Send photos of cracks or peeling coatings. Ask for the proposed surface preparation and return-to-use conditions for the chosen coating system in the quotation.
Common Questions
- How much does PU or epoxy floor coating cost per square metre?
- BBCP quotes based on the existing floor, area, preparation, and coating system agreed after assessment.
- Can a new coat go over an existing coating?
- The existing layer must first be assessed for condition and adhesion. Send photos of worn, loose, or damaged areas so the team can evaluate preparation needs.